HangJCPT Forever New JCPT Responsibility Lower Bed Truck Semi Trailer Manufacturer 3 Axles sixty Tons Reduced Bed Trailer Lowboy Minimal Loader Semi Trailer
Major Performance
Merchandise Specification | ||||
one | Kind | Semitrailer | ||
2 | Solution Title | Low Mattress Semitrailer | ||
3 | Dimension | 13000x3000x1600mm | ||
four | Tare Fat | 9430kg | ||
5 | Payload | 42t | ||
6
|
Working Method | Axles | FUWA , BPW, HUAJIN manufacturer,13t/16t/20t Excellent quality axles | |
Suspension | Tri-axle 10-pcs leaf spring suspension with equalizer beam (we can choose the Air suspension depend on JCPTer prerequisite) |
|||
Tires | Linglong, Double Coin, Triangle model eleven.00R20/eight.25R20/12.00R22.five, 12unit | |||
seven | Ladder | Manually operated or JCPT kind | ||
8 | Braking Technique | Dual lines pneumatic brake system, WABCO Emergency Relay Valve KORMEE Abdominal muscles braking technique |
||
9 | Frame | Main Beam | Q345B steel,Height 500, upper 16mm, lower 18mm. Mid web 10mm |
|
Cross Beam | Mild Alloy Q235 | |||
ten | King Pin | Dimensions: 50# (2”) or 90#(three.5”) Type: welded or assembled | ||
11 | Landing Gear | FUWA, JOST Manufacturer Single side operation or double side operation, Static capacity 28Ton |
||
12 | Electrical & Paint | Electrical | Rear light, rear reflector, turn indicative light, side reflector, fog lamp, number plate light | |
JCPTs & Reflectors | 24V, 7 lines | |||
Painting | zinc-wealthy primer and modified urethane topcoat as JCPTers’ options. | |||
Equipment | Tool BOX (BOX ONLY)—Offered WITH THE TRAILER TWO SPARE WHEEL HOLDER(WINCH),BUT NO SPARE TYRES |
I.The Application and the Technical Highlights:
—The reduced bed semitrailers are primarily appropriate for the MID/Long distance transportation of mechanical gear, huge objects, highway building products, huge tanks, power plant gear or machine, and all kinds of metal items.
—The lower mattress semitrailer can bed divide into flat bed low mattress trailer, concave reduced mattress trailer, tyres seem lower bed trailer, tyres coated lower mattress trailer. The concave lower mattress trailer structured with tyre appeared design, the height of the cargo’s carrying platform from ground is 900mm.-Low platform helps make the stable transportation.
—The chassis is ladder type,longitudinal beam part is H-shaped. It has great rigidity and high energy.
— Substantial Good quality Body and high-tensile steel for hefty loading potential
— BPW, FUWA or Certificated Chinese Axles
—Stomach muscles brake system
—WABCO Automobile Manage System
—JOST ,FUWA or Chinese manufacturer parking leg and king pin
—Air and Mechanical Suspension
—Bolster the Chassis Instructure
II.The Edge
***Frame:making use of the advanced assembly welded equipments to weld the place body composition which shaped by welded-variety longitudinal beam (manufactured of 16Mn steel plate) and the total Run-by way of cross beam.Our take into account the strength,stiffness and toughness of the frame and style the frame is robust sufficient to have the weighty cargo.
***Suspension: JCPTweight design and style.Higher-strength substance with sturdy carrying capacity, impressive wear resistance house and performance steadiness and extended support existence.Wheel Monitor adjustable very easily and precisely, which shield the tires from abnormal use.Passed strict bench screening and road testing.
***Axle:Specially processed one-piece spindle of higher quality minimal alloy metal, which possesses powerful loading potential, prolonged existence, mild fat and impressive overall performance.Higher machining precision of the braking program can make the braking overall performance a lot more steady.
III.Innovative Approach
~~~Design and style Drawing: Before production, we will despatched the layout drawing to our JCPTer to validate the depth of the vehicle. We hope we can supply the most suited item to our JCPTer.
~~~Reducing and Welding: The I beam slicing undertake the Pc Numerical Control Plasma Cutting Equipment. The I beam welding undertake the Gantry Major Sill Welding Device.
~~~The Beam Welding: Primary beam and side beam all use I-formed beam, it can make certain the trailer a lot more resilient.Bolstered rear plate can steer clear of the rear plate was damaged away when weighty obligation equipment climbing the ramp of trailer.
~~~Floor Therapy: In buy to take away the rust of the trailer human body, we use the sand blasting to retreat the floor of the trailer.
The trailer can have the stunning look,the portray will be coating evenly, agency adhension, gloss much more tough
~~~Portray: A single layer of the anti-rust painting, two layer of portray
~~~Check: We will take a look at the good quality of the trailer ahead of delivery.
IV.The Depth of the Minimal Mattress Trailer
V. Classification Of The Reduced Mattress Trailer
VI. Guarrantee For The Components Of The Reduced Mattress Traielr:
ITEM NAME | Guarantee | ITEM NAME | Warranty | |||
MAIN FRAME | Body | 1 YEAR | RUNNING GEAR | AXLE | 6 MONTHS | |
SUSPENSION | 6 MONTHS | AXLE BEARING | 3 MONTHS | |||
KING PIN | 1 YEAR | WHEEL HUB | 3 MONTHS | |||
BALANCE ARM | 3 MONTHS | |||||
ITEM NAME | Guarantee | ITEM NAME | Guarantee | |||
BRAKING DEVICE | BRAKE DRUM | 3 MONTHS | SUPPORT DEVICE | LXIHU (WEST LAKE) DIS. GEAR | 6 MONTHS | |
BRKE CHAMBER | 3 MONTHS | SPARE WHEEL CARRIER | 6 MONTHS | |||
AIR RESERVOIR | 6 MONTHS | |||||
ITEM NAME | Guarantee | |||||
Other people | LEAF SPRING | 3 MONTHS | ||||
BRAKE CHAMBER DIAPHRAGM | 3 MONTHS | |||||
EMERGENCY RELAY VALVE | 3 MONTHS | |||||
BRAKE SHOE | 3 MONTHS | |||||
RELAY VALVE | 3 MONTHS |
VII. Dealing Approach
1. You deliver us an inquiries on your wanted trailer by way of our contact data.
two. We shall reply you in twelve several hours soon after we obtained our inquiry.
3. We will negotiate the detail of the trailer on your prerequisite.
four. Verified on the tech info.
5. Signal agreement.
six.thirty% down payment or LC issuing.
seven. Manufacturing
8. The Manufacturig method with current news.
nine. The Creation completement.
10.Stability payment .
eleven.Set up Cargo and Custom made Clearance
12. A/S services for one yr.