1.Solution parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany type can be opentional |
tire | 11R22.5/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electrical energy wiring | 6 main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping machine reduce the metal to tiny areas use for suitable welding and splicing
2)welding
soon after metal slicing procedure the subsequent phase is welding .this procedure the primary function is beam welding .the leading plate-bottom plate and the
middle plate will be welding together . this method will be use submerged arc welding method.this variety of welding is quite
particular .its solely utilized in I beam welding .after this welding procedure other areas of the trailer will be use diverse welding way
for diverse metal-argon arc welding-electric arc welding-guide welding-gasoline welding and so on
3)blasting
this procedure is use for the first action of surface area cleanness-tension reduction-derusting prior to paiting .
four)electrophoresis coating
this approach use for much more depth surface area cleanness
5)epoxy zinc primer spray coating
this approach is the lasting one ahead of paiting .after this approach the trailer an be paiting
6)assembly
following all the approach we have mationed .the final process of the trailer is assembly.this approach all the components will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
7)packing
The previous procedure is packing .all the trailer use diverse packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer