1.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./eight.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | one |
air wiring | doule air line |
electrical power wiring | six main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping device minimize the metal to small areas use for ideal welding and splicing
2)welding
after steel reducing process the subsequent action is welding .this process the principal work is beam welding .the best plate-bottom plate and the
middle plate will be welding with each other . this process will be use submerged arc welding approach.this sort of welding is very
particular .its completely utilized in I beam welding .following this welding procedure other parts of the trailer will be use diverse welding way
for diverse steel-argon arc welding-electric powered arc welding-handbook welding-gas welding and so on
three)blasting
this method is use for the first step of surface area cleanness-anxiety relief-derusting just before paiting .
4)electrophoresis coating
this process use for much more detail area cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting 1 just before paiting .after this approach the trailer an be paiting
six)assembly
after all the procedure we have mationed .the previous method of the trailer is assembly.this approach all the parts will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
7)packing
The last method is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer