1.Merchandise parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany sort can be opentional |
tire | 11R22.5/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/nine./eight./8.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | 1 |
air wiring | doule air line |
electricity wiring | 6 main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma cutting equipment lower the steel to tiny components use for suitable welding and splicing
2)welding
following metal cutting method the following phase is welding .this procedure the major work is beam welding .the top plate-base plate and the
middle plate will be welding with each other . this process will be use submerged arc welding approach.this variety of welding is very
unique .its completely used in I beam welding .following this welding process other components of the trailer will be use distinct welding way
for distinct steel-argon arc welding-electric arc welding-manual welding-gasoline welding and so on
three)blasting
this process is use for the first phase of area cleanness-anxiety aid-derusting prior to paiting .
four)electrophoresis coating
this approach use for much more detail area cleanness
5)epoxy zinc primer spray coating
this procedure is the long lasting 1 prior to paiting .following this method the trailer an be paiting
6)assembly
following all the process we have mationed .the final process of the trailer is assembly.this process all the components will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on
7)packing
The final method is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer