1.Item parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./8.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electrical energy wiring | 6 main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma cutting equipment reduce the steel to tiny components use for ideal welding and splicing
two)welding
after metal chopping process the up coming phase is welding .this approach the major work is beam welding .the best plate-bottom plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding method.this sort of welding is quite
special .its completely employed in I beam welding .following this welding approach other components of the trailer will be use diverse welding way
for distinct metal-argon arc welding-electric arc welding-handbook welding-fuel welding and so on
three)blasting
this procedure is use for the very first phase of floor cleanness-pressure reduction-derusting before paiting .
4)electrophoresis coating
this procedure use for far more detail surface area cleanness
5)epoxy zinc primer spray coating
this process is the lasting one particular before paiting .soon after this procedure the trailer an be paiting
six)assembly
following all the procedure we have mationed .the previous process of the trailer is assembly.this procedure all the components will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on
seven)packing
The very last method is packing .all the trailer use distinct packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer