one.Solution parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./8.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electricity wiring | 6 main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing device cut the steel to minor areas use for appropriate welding and splicing
2)welding
right after steel slicing method the next step is welding .this approach the principal function is beam welding .the prime plate-base plate and the
middle plate will be welding collectively . this process will be use submerged arc welding method.this variety of welding is very
particular .its solely employed in I beam welding .right after this welding process other parts of the trailer will be use different welding way
for diverse metal-argon arc welding-electrical arc welding-handbook welding-gas welding and so on
3)blasting
this approach is use for the initial step of area cleanness-pressure reduction-derusting ahead of paiting .
4)electrophoresis coating
this procedure use for far more detail floor cleanness
5)epoxy zinc primer spray coating
this method is the lasting a single prior to paiting .following this process the trailer an be paiting
six)assembly
following all the procedure we have mationed .the last treatment of the trailer is assembly.this procedure all the areas will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on
seven)packing
The previous process is packing .all the trailer use various packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer