one.Item parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany kind can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./eight.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electrical energy wiring | six core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing machine lower the steel to minor areas use for ideal welding and splicing
2)welding
after steel reducing procedure the following stage is welding .this approach the primary perform is beam welding .the leading plate-base plate and the
middle plate will be welding jointly . this method will be use submerged arc welding process.this variety of welding is extremely
unique .its exclusively utilised in I beam welding .soon after this welding method other components of the trailer will be use diverse welding way
for distinct steel-argon arc welding-electric powered arc welding-guide welding-fuel welding and so on
3)blasting
this process is use for the very first phase of floor cleanness-tension relief-derusting prior to paiting .
four)electrophoresis coating
this method use for far more element floor cleanness
5)epoxy zinc primer spray coating
this process is the lasting one before paiting .soon after this process the trailer an be paiting
6)assembly
soon after all the method we have mationed .the previous method of the trailer is assembly.this approach all the elements will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake technique and so on
7)packing
The previous process is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer