1.Solution parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany variety can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./8./8.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electricity wiring | six core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma cutting machine cut the steel to tiny components use for suited welding and splicing
two)welding
right after metal slicing process the up coming stage is welding .this procedure the principal function is beam welding .the top plate-base plate and the
middle plate will be welding collectively . this approach will be use submerged arc welding procedure.this variety of welding is quite
unique .its solely employed in I beam welding .after this welding method other components of the trailer will be use distinct welding way
for different metal-argon arc welding-electric powered arc welding-guide welding-gas welding and so on
3)blasting
this process is use for the initial action of surface area cleanness-tension relief-derusting ahead of paiting .
four)electrophoresis coating
this procedure use for far more element surface area cleanness
5)epoxy zinc primer spray coating
this process is the lasting one before paiting .following this method the trailer an be paiting
6)assembly
soon after all the approach we have mationed .the previous method of the trailer is assembly.this process all the areas will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on
7)packing
The very last approach is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer