one.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany sort can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./8.5 |
kingpin | two”/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | 1 |
air wiring | doule air line |
electrical power wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma slicing machine reduce the steel to minor areas use for ideal welding and splicing
2)welding
following metal chopping approach the up coming phase is welding .this procedure the principal work is beam welding .the top plate-base plate and the
middle plate will be welding with each other . this process will be use submerged arc welding approach.this sort of welding is really
particular .its solely utilized in I beam welding .soon after this welding approach other elements of the trailer will be use different welding way
for different metal-argon arc welding-electric powered arc welding-handbook welding-gasoline welding and so on
3)blasting
this method is use for the very first phase of floor cleanness-stress aid-derusting just before paiting .
four)electrophoresis coating
this process use for more depth floor cleanness
five)epoxy zinc primer spray coating
this procedure is the lasting one ahead of paiting .soon after this process the trailer an be paiting
six)assembly
right after all the approach we have mationed .the final treatment of the trailer is assembly.this method all the parts will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
seven)packing
The very last procedure is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer