one.Merchandise parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany variety can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electrical energy wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting machine minimize the steel to minor parts use for suited welding and splicing
two)welding
right after metal chopping procedure the up coming phase is welding .this procedure the principal perform is beam welding .the top plate-bottom plate and the
middle plate will be welding collectively . this method will be use submerged arc welding process.this kind of welding is quite
special .its completely employed in I beam welding .after this welding method other elements of the trailer will be use various welding way
for different metal-argon arc welding-electric arc welding-guide welding-fuel welding and so on
three)blasting
this method is use for the very first stage of floor cleanness-anxiety aid-derusting prior to paiting .
four)electrophoresis coating
this approach use for much more depth surface cleanness
5)epoxy zinc primer spray coating
this method is the long lasting one before paiting .right after this approach the trailer an be paiting
six)assembly
after all the method we have mationed .the very last procedure of the trailer is assembly.this approach all the parts will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
7)packing
The last procedure is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer