one.Item parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./8./8.5 |
kingpin | two”/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma reducing machine lower the steel to little components use for ideal welding and splicing
2)welding
after steel slicing approach the next phase is welding .this process the main operate is beam welding .the leading plate-base plate and the
middle plate will be welding collectively . this process will be use submerged arc welding process.this variety of welding is quite
particular .its completely used in I beam welding .right after this welding process other elements of the trailer will be use diverse welding way
for different steel-argon arc welding-electric powered arc welding-guide welding-fuel welding and so on
3)blasting
this process is use for the very first phase of surface cleanness-anxiety reduction-derusting ahead of paiting .
four)electrophoresis coating
this approach use for far more detail surface cleanness
5)epoxy zinc primer spray coating
this method is the lasting one prior to paiting .soon after this method the trailer an be paiting
six)assembly
right after all the approach we have mationed .the last treatment of the trailer is assembly.this process all the components will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake system and so on
7)packing
The very last process is packing .all the trailer use various packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer