one.Item parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany variety can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/9./8./8.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma cutting device minimize the steel to minor elements use for appropriate welding and splicing
two)welding
following steel cutting method the next action is welding .this process the principal operate is beam welding .the top plate-bottom plate and the
middle plate will be welding jointly . this process will be use submerged arc welding approach.this type of welding is very
specific .its completely utilised in I beam welding .soon after this welding method other areas of the trailer will be use diverse welding way
for diverse steel-argon arc welding-electric arc welding-guide welding-gas welding and so on
3)blasting
this process is use for the first stage of floor cleanness-pressure reduction-derusting prior to paiting .
4)electrophoresis coating
this procedure use for much more detail area cleanness
5)epoxy zinc primer spray coating
this approach is the lasting 1 before paiting .right after this procedure the trailer an be paiting
six)assembly
soon after all the process we have mationed .the last treatment of the trailer is assembly.this method all the elements will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on
seven)packing
The previous approach is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer