1.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany variety can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | 1 |
air wiring | doule air line |
electrical power wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma reducing equipment minimize the steel to small components use for appropriate welding and splicing
two)welding
soon after steel reducing approach the next stage is welding .this process the primary work is beam welding .the leading plate-bottom plate and the
middle plate will be welding with each other . this approach will be use submerged arc welding approach.this kind of welding is very
specific .its solely used in I beam welding .right after this welding method other components of the trailer will be use diverse welding way
for distinct steel-argon arc welding-electric arc welding-manual welding-gas welding and so on
3)blasting
this approach is use for the initial phase of surface cleanness-tension aid-derusting ahead of paiting .
4)electrophoresis coating
this process use for a lot more element floor cleanness
5)epoxy zinc primer spray coating
this process is the lasting a single prior to paiting .right after this procedure the trailer an be paiting
6)assembly
right after all the method we have mationed .the last method of the trailer is assembly.this process all the parts will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake system and so on
7)packing
The previous procedure is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer