1.Product parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./8.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | one |
air wiring | doule air line |
electrical power wiring | 6 main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma slicing machine lower the steel to little components use for appropriate welding and splicing
2)welding
soon after metal reducing procedure the following stage is welding .this approach the main work is beam welding .the best plate-bottom plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding procedure.this sort of welding is very
unique .its exclusively used in I beam welding .soon after this welding method other parts of the trailer will be use diverse welding way
for different steel-argon arc welding-electric powered arc welding-manual welding-gasoline welding and so on
three)blasting
this procedure is use for the initial action of surface cleanness-stress aid-derusting ahead of paiting .
4)electrophoresis coating
this process use for far more element floor cleanness
five)epoxy zinc primer spray coating
this approach is the long lasting one particular prior to paiting .right after this procedure the trailer an be paiting
6)assembly
soon after all the method we have mationed .the previous method of the trailer is assembly.this process all the elements will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
seven)packing
The previous procedure is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer