one.Solution parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany kind can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./eight.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma chopping machine reduce the steel to tiny components use for ideal welding and splicing
two)welding
after metal cutting process the subsequent stage is welding .this process the primary work is beam welding .the top plate-base plate and the
middle plate will be welding with each other . this process will be use submerged arc welding method.this kind of welding is extremely
unique .its exclusively employed in I beam welding .right after this welding process other components of the trailer will be use different welding way
for various metal-argon arc welding-electric powered arc welding-handbook welding-gasoline welding and so on
3)blasting
this approach is use for the first step of floor cleanness-pressure reduction-derusting ahead of paiting .
4)electrophoresis coating
this process use for far more depth area cleanness
five)epoxy zinc primer spray coating
this approach is the lasting a single before paiting .right after this approach the trailer an be paiting
six)assembly
following all the process we have mationed .the final procedure of the trailer is assembly.this process all the areas will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on
seven)packing
The final process is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer