one.Merchandise parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.5/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/9./eight./eight.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | one |
air wiring | doule air line |
electrical energy wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma cutting equipment cut the steel to minor elements use for suitable welding and splicing
2)welding
right after steel chopping procedure the following phase is welding .this method the principal work is beam welding .the best plate-base plate and the
middle plate will be welding together . this process will be use submerged arc welding process.this variety of welding is really
unique .its completely employed in I beam welding .following this welding method other areas of the trailer will be use various welding way
for distinct metal-argon arc welding-electric powered arc welding-manual welding-gas welding and so on
3)blasting
this approach is use for the 1st action of surface area cleanness-tension reduction-derusting ahead of paiting .
four)electrophoresis coating
this process use for more depth area cleanness
five)epoxy zinc primer spray coating
this procedure is the lasting one prior to paiting .following this approach the trailer an be paiting
six)assembly
right after all the procedure we have mationed .the previous treatment of the trailer is assembly.this method all the elements will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
7)packing
The last method is packing .all the trailer use distinct packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer