1.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany sort can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./eight./eight.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electrical energy wiring | 6 core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma slicing machine reduce the steel to little parts use for ideal welding and splicing
two)welding
following metal reducing method the next phase is welding .this procedure the major work is beam welding .the leading plate-base plate and the
middle plate will be welding with each other . this process will be use submerged arc welding process.this kind of welding is extremely
particular .its exclusively utilised in I beam welding .after this welding process other components of the trailer will be use various welding way
for diverse steel-argon arc welding-electric powered arc welding-manual welding-gasoline welding and so on
three)blasting
this process is use for the initial action of surface cleanness-tension aid-derusting ahead of paiting .
4)electrophoresis coating
this procedure use for far more element area cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting one prior to paiting .soon after this process the trailer an be paiting
6)assembly
soon after all the approach we have mationed .the final procedure of the trailer is assembly.this procedure all the components will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on
seven)packing
The previous method is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer