1.Merchandise parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.5/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./8./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | 1 |
air wiring | doule air line |
electricity wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma slicing device lower the metal to small components use for suited welding and splicing
two)welding
following steel slicing approach the next action is welding .this procedure the principal function is beam welding .the top plate-bottom plate and the
middle plate will be welding together . this method will be use submerged arc welding approach.this variety of welding is quite
unique .its exclusively utilized in I beam welding .after this welding process other elements of the trailer will be use different welding way
for different metal-argon arc welding-electric powered arc welding-guide welding-fuel welding and so on
3)blasting
this method is use for the very first stage of floor cleanness-stress relief-derusting just before paiting .
4)electrophoresis coating
this approach use for far more element surface area cleanness
5)epoxy zinc primer spray coating
this method is the lasting 1 just before paiting .right after this procedure the trailer an be paiting
six)assembly
soon after all the approach we have mationed .the very last treatment of the trailer is assembly.this process all the components will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake method and so on
seven)packing
The previous approach is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer