one.Solution parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany type can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./eight.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | 1 |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping equipment minimize the metal to small components use for suitable welding and splicing
two)welding
following metal cutting procedure the up coming step is welding .this procedure the primary operate is beam welding .the leading plate-base plate and the
middle plate will be welding together . this process will be use submerged arc welding method.this variety of welding is very
special .its exclusively utilized in I beam welding .after this welding process other components of the trailer will be use diverse welding way
for different metal-argon arc welding-electric powered arc welding-manual welding-fuel welding and so on
three)blasting
this procedure is use for the 1st phase of surface area cleanness-anxiety aid-derusting before paiting .
four)electrophoresis coating
this method use for much more depth surface area cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting 1 ahead of paiting .right after this procedure the trailer an be paiting
six)assembly
soon after all the method we have mationed .the previous procedure of the trailer is assembly.this procedure all the components will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on
seven)packing
The final approach is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer