1.Solution parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./8./eight.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma chopping equipment cut the steel to minor areas use for suited welding and splicing
two)welding
right after metal slicing procedure the next step is welding .this method the primary function is beam welding .the prime plate-bottom plate and the
middle plate will be welding together . this process will be use submerged arc welding process.this variety of welding is very
special .its completely employed in I beam welding .right after this welding process other components of the trailer will be use various welding way
for distinct steel-argon arc welding-electric powered arc welding-handbook welding-gas welding and so on
three)blasting
this approach is use for the initial step of area cleanness-tension reduction-derusting just before paiting .
four)electrophoresis coating
this procedure use for a lot more element floor cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting one prior to paiting .right after this procedure the trailer an be paiting
six)assembly
following all the approach we have mationed .the last method of the trailer is assembly.this approach all the parts will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on
7)packing
The last method is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer