1.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./8./8.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping device minimize the steel to little components use for appropriate welding and splicing
2)welding
following steel reducing method the subsequent step is welding .this approach the principal perform is beam welding .the leading plate-bottom plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding procedure.this kind of welding is quite
specific .its exclusively utilized in I beam welding .soon after this welding procedure other elements of the trailer will be use different welding way
for different metal-argon arc welding-electrical arc welding-manual welding-gas welding and so on
three)blasting
this approach is use for the very first action of area cleanness-pressure aid-derusting before paiting .
4)electrophoresis coating
this process use for more detail floor cleanness
5)epoxy zinc primer spray coating
this approach is the lasting one particular ahead of paiting .after this method the trailer an be paiting
six)assembly
right after all the method we have mationed .the very last method of the trailer is assembly.this process all the parts will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake technique and so on
7)packing
The very last method is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer