1.Product parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.5/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./8./8.5 |
kingpin | two”/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electrical power wiring | 6 core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma cutting device cut the steel to small elements use for ideal welding and splicing
2)welding
right after steel cutting procedure the next step is welding .this method the primary work is beam welding .the best plate-base plate and the
middle plate will be welding together . this approach will be use submerged arc welding method.this sort of welding is very
particular .its completely employed in I beam welding .following this welding approach other elements of the trailer will be use distinct welding way
for various metal-argon arc welding-electric arc welding-manual welding-gas welding and so on
three)blasting
this method is use for the 1st action of floor cleanness-tension aid-derusting before paiting .
4)electrophoresis coating
this approach use for far more detail floor cleanness
five)epoxy zinc primer spray coating
this method is the lasting 1 ahead of paiting .after this method the trailer an be paiting
6)assembly
following all the procedure we have mationed .the last procedure of the trailer is assembly.this procedure all the components will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
seven)packing
The previous process is packing .all the trailer use diverse packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer