one.Solution parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.5/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./eight.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | one |
air wiring | doule air line |
electrical energy wiring | 6 core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma chopping equipment minimize the metal to little elements use for ideal welding and splicing
two)welding
soon after metal chopping process the next stage is welding .this process the primary work is beam welding .the prime plate-bottom plate and the
middle plate will be welding with each other . this process will be use submerged arc welding method.this sort of welding is really
special .its exclusively used in I beam welding .right after this welding method other parts of the trailer will be use various welding way
for distinct steel-argon arc welding-electric arc welding-handbook welding-gas welding and so on
three)blasting
this approach is use for the 1st step of surface area cleanness-anxiety reduction-derusting ahead of paiting .
four)electrophoresis coating
this process use for more detail surface area cleanness
5)epoxy zinc primer spray coating
this approach is the lasting one particular prior to paiting .soon after this process the trailer an be paiting
six)assembly
soon after all the procedure we have mationed .the last process of the trailer is assembly.this approach all the elements will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on
seven)packing
The final method is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer