one.Solution parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany kind can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/9./8./8.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electrical power wiring | six core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping machine lower the metal to tiny elements use for suitable welding and splicing
two)welding
following steel chopping method the following step is welding .this procedure the principal function is beam welding .the top plate-base plate and the
middle plate will be welding with each other . this process will be use submerged arc welding approach.this kind of welding is extremely
unique .its completely employed in I beam welding .following this welding method other areas of the trailer will be use various welding way
for different steel-argon arc welding-electric powered arc welding-manual welding-gasoline welding and so on
three)blasting
this procedure is use for the 1st phase of surface cleanness-anxiety relief-derusting before paiting .
4)electrophoresis coating
this procedure use for much more detail floor cleanness
5)epoxy zinc primer spray coating
this process is the long lasting one particular before paiting .after this method the trailer an be paiting
six)assembly
soon after all the method we have mationed .the last process of the trailer is assembly.this procedure all the elements will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake method and so on
seven)packing
The very last approach is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer