one.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.5/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./8./8.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electrical power wiring | 6 main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma cutting device lower the metal to small elements use for ideal welding and splicing
2)welding
after steel slicing method the subsequent action is welding .this method the principal perform is beam welding .the prime plate-bottom plate and the
middle plate will be welding collectively . this method will be use submerged arc welding process.this kind of welding is very
specific .its solely employed in I beam welding .soon after this welding approach other parts of the trailer will be use distinct welding way
for distinct metal-argon arc welding-electric arc welding-guide welding-fuel welding and so on
three)blasting
this process is use for the very first step of surface area cleanness-pressure reduction-derusting prior to paiting .
four)electrophoresis coating
this approach use for a lot more element surface area cleanness
five)epoxy zinc primer spray coating
this approach is the long lasting a single before paiting .after this method the trailer an be paiting
six)assembly
soon after all the process we have mationed .the last method of the trailer is assembly.this approach all the areas will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on
7)packing
The very last procedure is packing .all the trailer use diverse packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer