1.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany sort can be opentional |
tire | 11R22.5/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./8./8.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electrical power wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma reducing device lower the steel to small parts use for appropriate welding and splicing
2)welding
after steel slicing process the next phase is welding .this approach the main function is beam welding .the prime plate-base plate and the
middle plate will be welding together . this procedure will be use submerged arc welding approach.this kind of welding is really
specific .its exclusively utilised in I beam welding .after this welding approach other parts of the trailer will be use distinct welding way
for different metal-argon arc welding-electric arc welding-guide welding-fuel welding and so on
3)blasting
this approach is use for the 1st action of floor cleanness-tension reduction-derusting before paiting .
4)electrophoresis coating
this process use for a lot more depth area cleanness
five)epoxy zinc primer spray coating
this procedure is the lasting one particular prior to paiting .after this approach the trailer an be paiting
six)assembly
following all the method we have mationed .the last treatment of the trailer is assembly.this process all the areas will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
seven)packing
The final method is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer