1.Solution parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./8.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | one |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping equipment minimize the metal to minor elements use for appropriate welding and splicing
two)welding
following metal cutting process the up coming action is welding .this method the major operate is beam welding .the top plate-bottom plate and the
middle plate will be welding jointly . this process will be use submerged arc welding method.this variety of welding is quite
special .its exclusively used in I beam welding .soon after this welding process other parts of the trailer will be use different welding way
for different metal-argon arc welding-electrical arc welding-guide welding-fuel welding and so on
three)blasting
this method is use for the 1st step of area cleanness-anxiety reduction-derusting prior to paiting .
4)electrophoresis coating
this method use for far more element area cleanness
5)epoxy zinc primer spray coating
this process is the lasting a single just before paiting .after this method the trailer an be paiting
6)assembly
following all the approach we have mationed .the previous process of the trailer is assembly.this process all the elements will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake method and so on
seven)packing
The previous method is packing .all the trailer use diverse packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer