1.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany type can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./8./eight.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | one |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma reducing device lower the steel to little components use for ideal welding and splicing
2)welding
right after metal reducing approach the up coming step is welding .this approach the major operate is beam welding .the top plate-bottom plate and the
middle plate will be welding collectively . this process will be use submerged arc welding procedure.this variety of welding is very
specific .its completely used in I beam welding .after this welding process other elements of the trailer will be use various welding way
for various metal-argon arc welding-electrical arc welding-guide welding-fuel welding and so on
three)blasting
this process is use for the very first phase of area cleanness-pressure relief-derusting ahead of paiting .
4)electrophoresis coating
this procedure use for much more depth floor cleanness
five)epoxy zinc primer spray coating
this process is the lasting 1 prior to paiting .soon after this method the trailer an be paiting
six)assembly
soon after all the method we have mationed .the final treatment of the trailer is assembly.this method all the parts will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake method and so on
seven)packing
The final procedure is packing .all the trailer use distinct packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer