one.Item parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany sort can be opentional |
tire | 11R22.five/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./8./8.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | 1 |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma slicing equipment cut the metal to tiny areas use for ideal welding and splicing
2)welding
soon after metal slicing procedure the up coming stage is welding .this procedure the principal operate is beam welding .the top plate-base plate and the
middle plate will be welding together . this process will be use submerged arc welding method.this sort of welding is quite
unique .its completely utilised in I beam welding .right after this welding procedure other elements of the trailer will be use various welding way
for various metal-argon arc welding-electrical arc welding-manual welding-gasoline welding and so on
three)blasting
this method is use for the first phase of area cleanness-anxiety reduction-derusting just before paiting .
four)electrophoresis coating
this approach use for much more detail area cleanness
five)epoxy zinc primer spray coating
this procedure is the lasting 1 ahead of paiting .after this process the trailer an be paiting
6)assembly
right after all the procedure we have mationed .the previous process of the trailer is assembly.this approach all the parts will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake program and so on
seven)packing
The final method is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer