one.Solution parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany sort can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./eight./eight.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electricity wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma chopping machine lower the metal to tiny components use for suited welding and splicing
2)welding
soon after metal chopping method the next action is welding .this process the principal function is beam welding .the top plate-base plate and the
middle plate will be welding together . this process will be use submerged arc welding method.this variety of welding is quite
special .its exclusively employed in I beam welding .soon after this welding process other components of the trailer will be use various welding way
for diverse metal-argon arc welding-electrical arc welding-handbook welding-fuel welding and so on
3)blasting
this approach is use for the very first step of surface area cleanness-tension relief-derusting prior to paiting .
4)electrophoresis coating
this procedure use for more element area cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting 1 prior to paiting .right after this approach the trailer an be paiting
6)assembly
following all the approach we have mationed .the last procedure of the trailer is assembly.this procedure all the parts will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake technique and so on
7)packing
The previous approach is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer