1.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany sort can be opentional |
tire | 11R22.5/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./8.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electrical energy wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma slicing machine cut the metal to tiny elements use for ideal welding and splicing
two)welding
following steel cutting procedure the next action is welding .this process the main operate is beam welding .the prime plate-bottom plate and the
middle plate will be welding together . this method will be use submerged arc welding method.this kind of welding is very
special .its exclusively utilized in I beam welding .after this welding process other parts of the trailer will be use diverse welding way
for distinct steel-argon arc welding-electric powered arc welding-guide welding-gas welding and so on
three)blasting
this process is use for the first stage of surface area cleanness-tension reduction-derusting just before paiting .
4)electrophoresis coating
this process use for more depth surface cleanness
five)epoxy zinc primer spray coating
this process is the long lasting 1 ahead of paiting .after this process the trailer an be paiting
6)assembly
following all the procedure we have mationed .the very last process of the trailer is assembly.this approach all the areas will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake method and so on
7)packing
The very last process is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer