1.Solution parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./eight.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electricity wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma reducing machine lower the metal to little elements use for appropriate welding and splicing
2)welding
after metal reducing procedure the subsequent stage is welding .this method the principal operate is beam welding .the prime plate-base plate and the
middle plate will be welding with each other . this process will be use submerged arc welding procedure.this kind of welding is very
particular .its solely employed in I beam welding .soon after this welding procedure other elements of the trailer will be use different welding way
for different steel-argon arc welding-electric arc welding-manual welding-gas welding and so on
3)blasting
this approach is use for the very first phase of surface cleanness-pressure reduction-derusting before paiting .
four)electrophoresis coating
this method use for much more detail surface cleanness
5)epoxy zinc primer spray coating
this approach is the lasting one particular just before paiting .following this procedure the trailer an be paiting
six)assembly
following all the process we have mationed .the last treatment of the trailer is assembly.this approach all the elements will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake method and so on
7)packing
The previous process is packing .all the trailer use distinct packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer