one.Product parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/9./eight./8.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electrical power wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing device cut the steel to minor elements use for ideal welding and splicing
2)welding
right after metal chopping approach the up coming phase is welding .this procedure the principal work is beam welding .the leading plate-bottom plate and the
middle plate will be welding jointly . this process will be use submerged arc welding procedure.this kind of welding is very
particular .its exclusively employed in I beam welding .following this welding approach other parts of the trailer will be use diverse welding way
for various metal-argon arc welding-electric powered arc welding-manual welding-gas welding and so on
three)blasting
this method is use for the first phase of floor cleanness-anxiety relief-derusting ahead of paiting .
four)electrophoresis coating
this process use for a lot more element area cleanness
five)epoxy zinc primer spray coating
this method is the lasting a single ahead of paiting .right after this procedure the trailer an be paiting
six)assembly
right after all the method we have mationed .the very last process of the trailer is assembly.this procedure all the areas will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
7)packing
The very last approach is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer