one.Item parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany sort can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/9./eight./8.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electrical power wiring | 6 core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma reducing device lower the metal to minor parts use for appropriate welding and splicing
two)welding
following steel cutting approach the up coming phase is welding .this approach the primary work is beam welding .the top plate-base plate and the
middle plate will be welding jointly . this method will be use submerged arc welding process.this kind of welding is extremely
special .its exclusively used in I beam welding .after this welding approach other areas of the trailer will be use distinct welding way
for different steel-argon arc welding-electric powered arc welding-guide welding-fuel welding and so on
3)blasting
this method is use for the very first action of area cleanness-tension reduction-derusting just before paiting .
four)electrophoresis coating
this procedure use for a lot more detail floor cleanness
five)epoxy zinc primer spray coating
this process is the lasting one just before paiting .soon after this approach the trailer an be paiting
6)assembly
following all the process we have mationed .the very last treatment of the trailer is assembly.this process all the areas will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
7)packing
The last process is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer