1.Merchandise parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.five/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/9./8./eight.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electrical energy wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma cutting machine cut the steel to minor elements use for suitable welding and splicing
2)welding
after steel slicing method the next step is welding .this approach the primary perform is beam welding .the prime plate-base plate and the
middle plate will be welding jointly . this process will be use submerged arc welding process.this variety of welding is quite
special .its completely used in I beam welding .following this welding approach other parts of the trailer will be use diverse welding way
for various metal-argon arc welding-electric arc welding-handbook welding-fuel welding and so on
three)blasting
this procedure is use for the initial stage of surface cleanness-stress aid-derusting prior to paiting .
four)electrophoresis coating
this process use for much more depth floor cleanness
5)epoxy zinc primer spray coating
this method is the long lasting 1 before paiting .after this approach the trailer an be paiting
six)assembly
soon after all the approach we have mationed .the final treatment of the trailer is assembly.this method all the areas will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on
7)packing
The last approach is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer