one.Solution parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./8./8.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | one |
air wiring | doule air line |
electricity wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma slicing equipment cut the metal to little areas use for suited welding and splicing
two)welding
following metal slicing method the following stage is welding .this method the primary operate is beam welding .the best plate-base plate and the
middle plate will be welding together . this process will be use submerged arc welding approach.this kind of welding is very
particular .its completely employed in I beam welding .right after this welding method other elements of the trailer will be use distinct welding way
for various metal-argon arc welding-electric arc welding-manual welding-gasoline welding and so on
3)blasting
this process is use for the very first stage of area cleanness-anxiety relief-derusting prior to paiting .
four)electrophoresis coating
this process use for a lot more depth area cleanness
5)epoxy zinc primer spray coating
this method is the long lasting a single prior to paiting .after this procedure the trailer an be paiting
six)assembly
soon after all the procedure we have mationed .the very last procedure of the trailer is assembly.this procedure all the elements will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake method and so on
seven)packing
The very last process is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer