one.Solution parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./8.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | 1 |
air wiring | doule air line |
electricity wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma cutting equipment minimize the metal to little elements use for appropriate welding and splicing
two)welding
after steel slicing method the up coming phase is welding .this process the principal work is beam welding .the prime plate-base plate and the
middle plate will be welding jointly . this method will be use submerged arc welding process.this kind of welding is really
unique .its exclusively utilised in I beam welding .soon after this welding procedure other areas of the trailer will be use various welding way
for various metal-argon arc welding-electric powered arc welding-guide welding-gasoline welding and so on
3)blasting
this procedure is use for the 1st step of floor cleanness-pressure relief-derusting before paiting .
four)electrophoresis coating
this process use for a lot more element surface area cleanness
5)epoxy zinc primer spray coating
this approach is the lasting one ahead of paiting .soon after this procedure the trailer an be paiting
6)assembly
soon after all the procedure we have mationed .the last process of the trailer is assembly.this approach all the elements will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake technique and so on
7)packing
The previous procedure is packing .all the trailer use distinct packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer