1.Merchandise parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/9./8./8.5 |
kingpin | two”/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | one |
air wiring | doule air line |
electricity wiring | 6 main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma slicing equipment minimize the metal to little elements use for appropriate welding and splicing
2)welding
after metal reducing approach the next stage is welding .this method the main operate is beam welding .the best plate-base plate and the
middle plate will be welding with each other . this procedure will be use submerged arc welding procedure.this sort of welding is extremely
specific .its solely utilised in I beam welding .following this welding method other parts of the trailer will be use distinct welding way
for diverse steel-argon arc welding-electric arc welding-handbook welding-fuel welding and so on
three)blasting
this method is use for the very first step of floor cleanness-pressure relief-derusting prior to paiting .
4)electrophoresis coating
this process use for much more detail area cleanness
five)epoxy zinc primer spray coating
this approach is the long lasting one prior to paiting .right after this approach the trailer an be paiting
6)assembly
right after all the procedure we have mationed .the very last procedure of the trailer is assembly.this process all the components will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
7)packing
The very last process is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer