HangJCPT Forever China Greatest Minimal Mattress Semi Trailer JCPT Responsibility for Sale 80ton 4 Axle thirteen Meters Minimal Bed Flatbed Semitrailer pictures & photos80ton 4 Axle 13 Meters
Principal Performance
Merchandise Specification | ||||
one | Kind | Semitrailer | ||
2 | Solution Name | Low Bed Semitrailer | ||
3 | Dimension | 13000x3000x1600mm | ||
4 | Tare Excess weight | 9440kg | ||
five | Payload | 42t | ||
six
|
Running Technique | Axles | FUWA , BPW, HUAJIN manufacturer,13t/16t/20t Great top quality axles | |
Suspension | Tri-axle 10-pcs leaf spring suspension with equalizer beam (we can pick the Air suspension depend on JCPTer prerequisite) |
|||
Tires | Linglong, Double Coin, Triangle brand 11.00R20/8.25R20/12.00R22.five, 12unit | |||
7 | Ladder | Manually operated or JCPT type | ||
8 | Braking System | Dual lines pneumatic brake system, WABCO Emergency Relay Valve KORMEE Abdominal muscles braking technique |
||
9 | Frame | Main Beam | Q345B steel,Height 500, upper 16mm, lower 18mm. Mid web 10mm |
|
Cross Beam | Mild Alloy Q235 | |||
10 | King Pin | Measurement: 50# (2”) or 90#(three.5”) Type: welded or assembled | ||
11 | Landing Gear | FUWA, JOST Brand Single side operation or double side operation, Static capacity 28Ton |
||
12 | Electrical & Paint | Electrical | Rear light, rear reflector, turn indicative light, side reflector, fog lamp, number plate light | |
JCPTs & Reflectors | 24V, 7 lines | |||
Painting | zinc-prosperous primer and modified urethane topcoat as JCPTers’ options. | |||
Accessories | Tool BOX (BOX ONLY)—Presented WITH THE TRAILER TWO SPARE WHEEL HOLDER(WINCH),BUT NO SPARE TYRES |
I.The Application and the Technical Highlights:
—The reduced bed semitrailers are largely ideal for the MID/Long length transportation of mechanical products, large objects, highway development gear, large tanks, energy plant equipment or device, and all sorts of steel merchandise.
—The lower bed semitrailer can mattress divide into flat mattress low mattress trailer, concave lower bed trailer, tyres appear reduced bed trailer, tyres lined low bed trailer. The concave minimal mattress trailer structured with tyre appeared design, the height of the cargo’s carrying platform from ground is 900mm.-Low platform helps make the stable transportation.
—The chassis is ladder type,longitudinal beam section is H-shaped. It has great rigidity and substantial strength.
— Large High quality Body and high-tensile steel for large loading capacity
— BPW, FUWA or Certificated Chinese Axles
—Abdominal muscles brake method
—WABCO Automobile Management Technique
—JOST ,FUWA or Chinese brand parking leg and king pin
—Air and Mechanical Suspension
—Bolster the Chassis Instructure
II.The Edge
***Frame:making use of the superior assembly welded equipments to weld the space frame composition which shaped by welded-kind longitudinal beam (made of 16Mn steel plate) and the total Operate-by way of cross beam.Our think about the energy,stiffness and toughness of the frame and design and style the frame is powerful enough to have the weighty cargo.
***Suspension: JCPTweight design.High-toughness substance with robust carrying capability, exceptional wear resistance residence and overall performance balance and lengthy support existence.Wheel Track adjustable effortlessly and properly, which defend the tires from abnormal put on.Passed rigid bench testing and highway tests.
***Axle:Specifically processed one-piece spindle of high quality low alloy steel, which possesses robust loading ability, lengthy existence, light weight and impressive functionality.High machining precision of the braking technique tends to make the braking performance far more steady.
III.Innovative Approach
~~~Design and style Drawing: Prior to generation, we will despatched the design drawing to our JCPTer to verify the detail of the motor vehicle. We hope we can offer the most suited solution to our JCPTer.
~~~Chopping and Welding: The I beam chopping undertake the Laptop Numerical Manage Plasma Cutting Machine. The I beam welding adopt the Gantry Major Sill Welding Machine.
~~~The Beam Welding: Main beam and aspect beam all use I-shaped beam, it can make certain the trailer a lot more sturdy.Strengthened rear plate can steer clear of the rear plate was broken absent when heavy responsibility devices climbing the ramp of trailer.
~~~Area Treatment: In get to eliminate the rust of the trailer physique, we use the sand blasting to retreat the area of the trailer.
The trailer can have the beautiful physical appearance,the painting will be coating evenly, agency adhension, gloss a lot more durable
~~~Portray: One particular layer of the anti-rust painting, two layer of portray
~~~Examination: We will examination the good quality of the trailer just before shipping.
IV.The Detail of the Low Mattress Trailer
V. Classification Of The Minimal Mattress Trailer
VI. Guarrantee For The Components Of The Reduced Mattress Traielr:
ITEM NAME | Guarantee | ITEM NAME | Warranty | |||
MAIN FRAME | Body | 1 YEAR | RUNNING GEAR | AXLE | 6 MONTHS | |
SUSPENSION | 6 MONTHS | AXLE BEARING | 3 MONTHS | |||
KING PIN | 1 YEAR | WHEEL HUB | 3 MONTHS | |||
BALANCE ARM | 3 MONTHS | |||||
ITEM NAME | Guarantee | ITEM NAME | Warranty | |||
BRAKING DEVICE | BRAKE DRUM | 3 MONTHS | SUPPORT DEVICE | LXIHU (WEST LAKE) DIS. GEAR | 6 MONTHS | |
BRKE CHAMBER | 3 MONTHS | SPARE WHEEL CARRIER | 6 MONTHS | |||
AIR RESERVOIR | 6 MONTHS | |||||
ITEM NAME | Guarantee | |||||
Others | LEAF SPRING | 3 MONTHS | ||||
BRAKE CHAMBER DIAPHRAGM | 3 MONTHS | |||||
EMERGENCY RELAY VALVE | 3 MONTHS | |||||
BRAKE SHOE | 3 MONTHS | |||||
RELAY VALVE | 3 MONTHS |
VII. Working Procedure
1. You send us an inquiries on your desired trailer by means of our contact information.
2. We shall reply you in twelve hrs following we obtained our inquiry.
three. We will negotiate the detail of the trailer on your necessity.
four. Verified on the tech info.
five. Sign deal.
6.30% down payment or LC issuing.
seven. Production
eight. The Manufacturig method with up to date information.
nine. The Manufacturing completement.
10.Harmony payment .
eleven.Set up Cargo and Custom Clearance
12. A/S support for 1 calendar year.